[Nationally Available] Tunnel Monitoring Staff Passageway Retaining Wall Tunnel L-Walk
Shortened construction period! Drainage between blocks has become possible, eliminating the need for the construction of drainage ditches.
The "Tunnel L-Walk" for tunnel monitoring staff passageway is a precast retaining wall installed to ensure the safety of workers engaged in maintenance and management. In addition to shortening construction time, ensuring high quality, and providing a beautiful finish, the base slab is constructed on-site, allowing for flexibility in on-site casting. The design takes into account vehicle collision loads (H=900: 22kN/m, H=1000: 20kN/m), providing solid protection for workers and pipelines at the back. 【Features】 - Drainage holes are formed between blocks, allowing for drainage to the front side. - Precasting enables simultaneous construction and combinations of processes, leading to reduced construction time. - The omission of drainage ditches allows for further time savings. - The need for rebar and formwork can be eliminated, enabling labor-saving construction. - Nationwide support is available. *For more details, please refer to the PDF document or feel free to contact us.*
- Company:大和クレス
- Price:Other